<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Weekly City Update</title>
	<atom:link href="http://www.centralspeaks.com/weekly-city-update-15/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.centralspeaks.com/weekly-city-update-15/</link>
	<description>The 411 on Central</description>
	<lastBuildDate>Thu, 02 Feb 2012 15:27:24 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=35b6de</generator>
	<item>
		<title>By: David Barrow</title>
		<link>http://www.centralspeaks.com/weekly-city-update-15/comment-page-1/#comment-490</link>
		<dc:creator>David Barrow</dc:creator>
		<pubDate>Fri, 26 Feb 2010 03:51:00 +0000</pubDate>
		<guid isPermaLink="false">http://www.centralspeaks.com/?p=6675#comment-490</guid>
		<description>1)  The developers of the Village at Magnolia Square are paying 100% of the cost of the installation of the roundabout.

2)  Residents along Crystal Drive met tonight (Feb. 25) and requested that Stop signs be installed at three intersections on their street as a solution for the traffic calming on their street. This was the city&#039;s recommendation as well.  The signs should be installed within 3 weeks.</description>
		<content:encoded><![CDATA[<p>1)  The developers of the Village at Magnolia Square are paying 100% of the cost of the installation of the roundabout.</p>
<p>2)  Residents along Crystal Drive met tonight (Feb. 25) and requested that Stop signs be installed at three intersections on their street as a solution for the traffic calming on their street. This was the city&#8217;s recommendation as well.  The signs should be installed within 3 weeks.</p>